Warrenton, VA Arrow XTâ„¢ Pumper

Dual Roto-Rays and an electric deck gun

(Pierce Manufacturing, YouTube)

Pierce Manufacturing – The goal for the Warrenton Volunteer Fire Company was to achieve a shorter overall length and height than their current rigs without having to sacrifice equipment space. This was accomplished with their Arrow XT Pumper. Because the department went with a smaller rig, the 5-man cab utilizes space with maximum compartmentation. For an easier wipe down after taking calls, a vinyl interior was chosen as part of the CARE initiative.

Each intake on the pump panel has an auxiliary primer in order to not lose a draft when getting the water to the valve. The valve located on top of the fire engine allows the driver to set the pressure manually and charge it, previously having an electric deck gun. The compartments on the rig are designed to fit the departments needs with various customizations.

See More Videos on FirefighterNation.com

This engine has a typical ladder complement: 24’ extension ladder, 14’ roof ladder and a 10’ folding attic ladder. Located on the front of the rig, in addition to the dual roto rays, there will be 25’ of 5” hose with the front intake and a storage compartment for fire hydrant tools.

CHASSIS
Chassis: 67” Arrow XTâ„¢ cab
Seating capacity: 5
Overall length: 30’ 9.75”
Overall height: 9’ 7”
GVW rating: 49,800 lb
Front axle: TAK4® Independent Front Suspension, 22,800 lb
Rear axle: Meritor RS26-185, 27,000 lb
Engine: DDC DD13, 505 hp, 1,750 torque
Electrical: Command Zoneâ„¢
Safety: Frontal Impact and Side Roll Protection

BODY
Material: Aluminum
Shelving: Adjustable, up to 500 lb
Doors: Lap
Pump: Hale, 2,000 gpm
Tank: 750 gallons
Foam system: Huskyâ„¢ 12
Foam cell: 50 gallons

Job No: 33904
Dealership: Atlantic Emergency Solutions, Inc.

CA Firefighters Struggle for Access to Smoke Detox Treatment

After battling toxic wildfire smoke in Los Angeles, firefighters receive glutathione treatments from nonprofits to help repair cell damage.

Plano (TX) Firefighters Push City to Pilot Test 48/96 Shift

The Plano Firefighters Association is pushing for a test of a 48/96 schedule, where firefighters would work two consecutive 24-hour shifts before having four days…